Project Information:
The refurbishment of the second level of Queen Mary’s Hospital involved completely gutting out the entire area and starting from scratch. It was a fast paced project as currently ill children had to be transported to a temporary location whilst the works were being completed. There was also added pressure due to the COVID-19 climate we are in as precious bed space was being taken up. By the end of the job, we had created; Three 4 bed wards, one 3 bed ward, nine 1 bed cubicles; one sluice room, one nurse room, two disabled wet rooms including dock end packed toilets, two WC’s, one en suite toilet, one meeting room, one parents room, a reception area including 3 nurse base stations, one equipment store room, one cleaners cupboard and a treatment room.
PROJECT DESCRIPTION
The new ward refurbishment consisted of the following:
- Demolition
- New partitions
- Installation of new door sets including ironmongery
- Duct work configuration
- New suspended ceiling and also adaption to existing curved ceiling
- Installation of vinyl flooring throughout entire area
- Installation of sun reflective film to windows
- New heat resistant roller blinds to windows
- Three reception desks
- Nurse call systems
- Security mag lock access control fitted to doors (unlock via smart pads)
- Bioclad installation to walls
- 1st and 2nd fix electrical
- 1st and 2nd fix mechanical
- Installation of numerous IPS panels
- Scaffold erection
- Core drilling to allow for a waste connection to the floor below
- Medical gas installation (air,vacuum,oxygen)
- Decoration works
- Shelving installation
- Maccerator installation (machine to wash bed pans)
- Configuration of existing structural openings (taking out sliding doors and installation architraves)
- Cableflow trunking
- Worktop installation to several areas
- Rendering patch work
- MDF boxing to domestic pipework
- Cubicle track installation