01342844118 [email protected]

Ward Refurbishment to Queen Mary’s Hospital for Children at St Helier Hospital

CLIENT – Epsom & St Helier University Hospitals
VALUE – £519K
DURATION –  10 Weeks

Project Information:

The refurbishment of the second level of Queen Mary’s Hospital  involved completely gutting out the entire area and starting from scratch. It was a fast paced project as currently ill children had to be transported to a temporary location whilst the works were being completed. There was also added pressure due to the COVID-19 climate we are in as precious bed space was being taken up. By the end of the job, we had created; Three 4 bed wards, one 3 bed ward, nine 1 bed cubicles; one sluice room, one nurse room, two disabled wet rooms including dock end packed toilets, two WC’s, one en suite toilet,  one meeting room, one parents room, a reception area including 3 nurse base stations,  one equipment store room, one cleaners cupboard and a treatment room.

PROJECT DESCRIPTION

 The new ward refurbishment consisted of the following:

  • Demolition
  • New partitions
  • Installation of new door sets including ironmongery
  • Duct work configuration
  • New suspended ceiling and also adaption to existing curved ceiling
  • Installation of vinyl flooring throughout entire area
  • Installation of sun reflective film to windows
  • New heat resistant roller blinds to windows
  • Three reception desks
  • Nurse call systems
  • Security mag lock access control fitted to doors (unlock via smart pads)
  • Bioclad installation to walls
  • 1st and 2nd fix electrical
  • 1st and 2nd fix mechanical
  • Installation of numerous IPS panels
  • Scaffold erection
  • Core drilling to allow for a waste connection to the floor below
  • Medical gas installation (air,vacuum,oxygen)
  • Decoration works
  • Shelving installation
  • Maccerator installation (machine to wash bed pans)
  • Configuration of existing structural openings (taking out sliding doors and installation architraves)
  • Cableflow trunking
  • Worktop installation to several areas
  • Rendering patch work
  • MDF boxing to domestic pipework
  • Cubicle track installation

 

Head Office

Burstow Lodge Court, Chapel Road, Smallfield, Horley, Surrey, RH6 9YR

Call Us

01342844118

 

Email Us

[email protected]

 

Office Hours

Mon-Fri: 8am – 5pm
Sat-Sun: Closed

Pin It on Pinterest

Share This

By continuing to use the site, you agree to the cookie information. more information

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.

Close